How to run a 30-day TMS pilot: an acceptance scorecard

Plan a bounded TMS evaluation with baseline tasks, operating owners, test records, correction measures, reconciliation, and a documented acceptance decision.

Run a TMS pilot with a small, agreed scope, a measured baseline, named operating owners, and acceptance criteria written before the vendor starts. An illustrative 30-day window can structure that evaluation, but the final decision should follow the evidence. Keep production cutover conditional on the requirements your fleet actually proves.

RunaboutX publishes this proposed scorecard. The calendar and thresholds below are planning examples, not a deployment commitment or reported customer result. RunaboutX's approved fleet story is separate qualitative feedback from its stated pilot period; it does not validate the sample targets in this article.

Agree the decision and boundaries first

Choose one recurring workflow, a representative set of records, and the roles who will operate it. Name a dispatcher, finance reviewer, implementation owner, and final decision maker. Specify the test environment and the actions that require explicit approval before they affect real customers, drivers, or accounting records.

Select the loads because they represent the work: include a normal case, a document revision, missing evidence, and a recoverable connection problem. Record the sample selection and limitations. An unusually clean set can help test setup but cannot represent the full operation.

Use a four-stage evaluation calendar

Illustrative periodWorkExit evidence
Days 1–5Define scope, baseline, sample, roles, and expected answersAccepted test packet and agreed measures
Days 6–10Configure the workflow and train the people operating itUsers complete sample tasks and explain the boundaries
Days 11–23Run representative cases and correction scenariosComplete records, timing observations, errors, and reconciliations
Days 24–30Resolve critical gaps and make the decisionContinue, extend, or stop with reasons and owners

Adjust the schedule to actual readiness. A connection delay or incomplete source data should change the plan visibly; it should not be hidden by declaring the calendar complete.

Establish a usable baseline

Define the start and finish of each task. For load entry, completion might mean accepted fields ready for dispatch. For invoice review, it might mean an approved amount and usable document in the receiving accounting workflow. Record preparation, review, correction, and follow-up separately.

Use comparable tasks and the same operating definitions in the pilot. Preserve sample count, dates, and failed or abandoned attempts. If a task needs different staffing or excludes a step from the old process, explain that difference before calling the times comparable. The ROI calculator can model a scenario after you supply credible inputs; it cannot establish the baseline for you.

Build an acceptance scorecard

RequirementExample acceptance rule to adaptOwner and evidence
Required load fieldsEvery critical field is accepted or explicitly unresolved before dispatchDispatcher; field-level comparison and source
Document revisionsAccepted version and earlier commitment remain traceableOperations lead; revision history
Approval boundaryRestricted actions follow the agreed permission and approval processResponsible reviewer; attempted action and result
Financial handoffSample counts and approved amounts reconcileFinance; invoice, adjustment, and receiving record
Integration recoveryFailed and repeated updates reach the agreed final stateImplementation owner; recovery and reconciliation log
UsabilityThe trained operator completes the task and identifies outstanding workRole owner; observed steps and assistance needed
Data accessA sample export preserves the agreed records and relationshipsData owner; opened files and reconciliation

Set the critical requirements before testing. An average score can conceal a failed approval boundary or incorrect invoice, so give those failures an explicit decision rule. Agree any numerical target with your own operation rather than borrowing a vendor's marketing percentage.

Include difficult but bounded tests

Use the AI extraction packet to test revisions, duplicates, and ambiguity. Use the integration exercises for stale data, failures, and retries. Make those tests simulated and agreed with the vendor.

After a correction, repeat the affected case and retain both results. Avoid dropping an inconvenient failure from the sample or restarting the measurement window without documenting why. The goal is a clear operating decision, not a favorable demonstration score.

End with a documented choice

Continue when critical requirements are demonstrated, the responsible people can operate the workflow, and the written commercial scope matches the tested product. Extend when a bounded unresolved issue has an owner, a fix, and a retest date. Stop when a critical requirement remains unsupported or the complete effort does not justify the proposed change.

Record the decision, evidence, outstanding dependencies, and next responsible person. Keep any later production rollout as its own readiness decision. Use the buyer's guide to connect the result to the wider purchase, and book a RunaboutX demo with this scorecard if you want to apply it to the available product.

Frequently asked questions

Does this plan promise a production rollout in 30 days?

No. Thirty days is an illustrative evaluation window. Production readiness depends on actual scope, data, connections, training, agreements, and acceptance evidence.

Can I count a fast AI extraction as the pilot's time saving?

Measure the complete comparable task, including preparation, review, correction, and follow-up. Preserve failures and sample size; a faster intermediate step alone does not establish a better completed workflow.